Case Study#1
............................................................................................................................................................................................................
Uplift 500 Elements from COBOL I, II to Enterprise Cobol
Typical Total Time: 6 Months Utilizing Makware: 3 Months

Project Issues
  • Massive Program , PROC and JCL Changes.
  • COBOL compilations.
  • Documentation Changes.
  • Source Code Compares and File Compares.
Along with our standard Makware Tools, M390COBL and M390JCL tools were used.


Case Study#2
............................................................................................................................................................................................................
Convert IP Addresses to DNS names – 40 Programs
Typical Total Time: 2 Months Utilizing Makware: 1 Month

Project Issues
  • Scan all source libraries for hard coded IP addresses.
  • Modify source programs from IP addresses to DNS Names.
  • Compile source programs.
  • Documentation Changes.
  • Source Code Compares and File Compares.
Along with our standard Makware Tools, MIP2DNS tool was used


Case Study#3
............................................................................................................................................................................................................
Create COBOL Copybooks from IMS DC MFS code – 200 MFS
Typical Total Time: 3 Months Utilizing Makware: 2 Weeks

Project Issues
  • Convert MFS DIF/DOF Macros to COBOL Copybooks.
  • Understand MFS rules and adapt to different coding styles.
Along with our standard Makware Tools, MMFS2CPYS tool was used


Case Study#4
............................................................................................................................................................................................................
Convert DATAVANTAGE control cards to similar in-house developed Product – 400-500 members
Typical Total Time: 2 Months Utilizing Makware: 1 Weeks

Project Issues
  • Convert Datavantage control cards.
  • Understand both Datavantage Control statements and in-house developed product control statements.
Along with our standard Makware Tools, MKVAN tool was used
Typical Stages of a development or maintenance project using SDLC methodology during ‘Design, Construction and Implementation Phases’
  • Impact Analysis of existing applications / systems.

  • Pull existing version of source or create a new program using change management software.

  • Modify the source or create new programs.

  • Compile the source program or put back the source in change control management.

  • Compile until there are no errors.

  • Pull Production JCLs and customize for unit Testing or Create Test JCLs for new programs.

  • Create Test Files, and associated documentation like Test Grids, etc.

  • Execute test JCLs.

  • Validate results and if they are not as expected, Modify source, Compile and Test program.

  • Once Test are OK, document the results, code compares etc.

  • Create or Modify Production JCLs and put back in the change management system.

  • Repeat above steps for String Test, UAT, SIT, Regression and Performance Testing etc.